Projects

Berth 4 Upgrade Project

Berth 4 Upgrade The Port of Townsville is a vital trading port for North Queensland and is Northern Australia’s largest general cargo and container port. Berth 4 was previously used mainly for cement imports via a dedicated pipeline to an off-berth storage facility, as well as some general cargo and live cattle export activity. The […]

MORE +

Haughton Pipeline Duplication Project

This project aims to provide improve Townsville’s water security and meet the bulk water supply by constructing a new raw water delivery pipeline from the Upper Haughton Irrigation Channel to Toonpan Creek at the head of the Ross River Dam. Installation of 9.0km of DN1800 Glass Reinforced Polymer (GRP) pipe Installation of GRP pipe through […]

MORE +

Townsville Ring Road Stage 3

The scope of works involved the design and construction of a single carriageway two-way grade separated road. It was extended approximately 7km from the existing Section 1 at Riverway Drive to connect with the existing intersection at Shaw and Dalrymple Road, which was reconfigured as part of the project scope. The project included six bridges, […]

MORE +

Moreton Bay Rail Project

With the region’s population set to climb to more than 530,000 by 2031, Moreton Bay is one of Australia’s fastest growing urban areas. The Moreton Bay Rail (MBR) project was the single biggest infrastructure investment in the region and will help reduce congestion between the Redcliffe area and Brisbane through improved public transport. Each full […]

MORE +